MYRRHA building

 MYRRHA building on site

The MYRRHA subcritical fast core and its whole series of internals as well as the operation equipment should be installed in an air-controlled environment. The re-use of existing facilities was found impossible, these facilities being not compatible with the Remote Handling philosophy presented elsewhere. A new building has therefore to be erected on the SCK•CEN Mol site.

This building is quite large (100 m length, 30 m width, 40 m height; this height being subdivided, in the "reference" configuration, into 10 m above ground level and 30 m underground). The construction of such large and heavy building is a challenge in itself. For a more detailed view, check out the civil engineering.

 
 MYRRHA building on site At present time we have found one main location on the SCK•CEN site for installing the MYRRHA building, its accelerator and the related auxiliaries. To have a look, proceed to site plan.

Another required feature of the building is what one calls in jargon the shielding: the building must shield the neighbourhood of radioactive radiation during operation, but also in case of an accident. For more information on the shielding and the related calculations, have a look here.